Galaxy Aqua Premier Installation Manual Better Extra Quality Jun 2026
Inspect all pipework and the pressure relief device (PRD) before replacing the cover. Cover Attachment:
Before mounting your unit or cutting pipes, you must ensure that your domestic supply aligns with the system's strict architectural requirements. Core Hardware Specs : 9.5kW at 240V. Dimensions : 16cm (Height) x 30.7cm (Width) x 7.4cm (Depth). System Type : Unvented, instantaneous high-pressure system.
Connect the Reject/Drain port of the machine to your kitchen sink or drain pipe. Keep this tube below the level of the machine to prevent backflow. Step 5: System Flushing and Initial Start-Up galaxy aqua premier installation manual better
Before you begin the installation process, make sure you have:
Close the kitchen drinking faucet and open the storage tank valve. Allow the tank to fill completely (this takes roughly 45 to 60 minutes). Once full, open the faucet again and let the entire tank drain completely until the water drops to a slow trickle. Repeat this tank-filling and draining cycle one more time. Pro-Tips for Peak Performance and Maintenance Inspect all pipework and the pressure relief device
The Galaxy Aqua Premier works best with at least 40 - 60 psi. If your pressure is lower, you may need a booster pump. 2. Step-by-Step Installation Process Step 1: Installing the Feed Water Adapter
The system may not be reaching shutoff pressure; check for leaks or low input pressure. Conclusion Dimensions : 16cm (Height) x 30
The Galaxy Aqua Premier must or in any location susceptible to freezing temperatures. Ambient frost can expand internal water channels, rupture the brass heating tanks, and completely void the manufacturer's warranty coverage. 2. Level Mounting Position