Gerin Multi 9 Ic 2000 P Manual | Merlin
Verify wiring (3-4 NO or 3-5 NC). Ensure mode is set to "AUTO". Wrong time/day set. Re-enter programming mode and verify times and days. Buttons not responding Device locked or error.
A manual override switch typically offering three positions:
is a high-performance programmable twilight switch designed to automate lighting based on both ambient light levels and pre-set schedules. Originally manufactured under the Merlin Gerin brand and now integrated into the Schneider Electric Acti 9 range , this device is commonly used for street lighting, storefront displays, and security systems to optimize energy consumption. Merlin Gerin Multi 9 Ic 2000 P Manual
230V AC, +10% / -15% tolerance, 50/60 Hz.
) is a programmable twilight switch used to manage lighting based on both outdoor brightness and specific time schedules. It is commonly used for shop windows, street lighting, and advertising signs. www.electricline.ru Core Functionality Verify wiring (3-4 NO or 3-5 NC)
Before installation, it is crucial to understand the technical limitations of the device. 230V AC +10%, -15%, 50/60 Hz. Output Contact: 16A at 250V AC ( ), 10A at 250V AC ( Measurement Range: 2 to 2000 Lux. Programmable Channels: 1 channel (switching output). Power Consumption: Maximum 6 VA. Installation: DIN Rail mounting.
The Multi 9 IC 2000 P features an integrated digital clock or mechanical dial framework (depending on the production year variant) overlaid with a threshold adjustment potentiometer. Below are the steps required to program standard modern digital iterations. Step 1: Setting the Date and Time Re-enter programming mode and verify times and days
This article serves as a comprehensive guide and manual, covering technical specifications, installation, programming, and troubleshooting based on official Schneider Electric (formerly Merlin Gerin) documentation . 1. Introduction to the IC 2000 P
Here is a quick cheat sheet based on the original manual's FAQ: